Tips, Tricks & Resources For MEP Detailers

  • Subscribe

  • Learn More About RSS Feeds

  • RSS Autodesk MEP Forum

    • An error has occurred; the feed is probably down. Try again later.
  • RSS Autodesk Navisworks topics

    • Navisworks 2017-2018 internal error when opening revit files July 21, 2018
       Hello all,     I can't load revit file in navisworks 2017-2018-2019 beacause of internal error. Is there any hotfix or help ? 
      ESS-ibenhassen
    • Plant in Revit after exort NWC import to Naviswork is not visible realistic. July 21, 2018
      Hi guys,I have a model in revit which i want to import Naviswork to create simulation.But, Plant in Revit after exort NWC import to Naviswork is not visible realistic. Like this pic  Thanks in advance
      phihungrevit
    • Autocad Plant 3D drawing shown as wireframe in Navisworks Manage 2018 July 20, 2018
      I have both NW Simulate 2018 and NW Manage 2018 installed.I have downloaded and installed the following object enabler:AutoCAD_Plant_3D_2018_Object_Enabler_English_Win_64bit_dlmIt works for NW Simulate 2018 but not for NW Manage 2018.AutoCad Plant 3D objects are still shown as wireframe in Manage 2018Any solutions for this issue ?Kind regards, Gordana
      gorpXG8M5
    • how to import google map to Navisworks from Revit July 20, 2018
      I read in the post regarding the import of google map into navisworks. I tried downloading the plugin cadtoearth for revit. Late then i am not able to log into the plugin and carry out the work successfully. Its showing a error message. i am not able to bring the plugin inside Revit. kindly suggest me any other idea to import the google map to RevIt and then […]
      saranya-n
    • .NWD file size July 20, 2018
      why does the file size increase while exporting to .NWC from Revit project?I want to carry out quantity take off  in navisworks 2018, but the process is not improving at all and i have been waiting for more than half a day. its still in 2.4%.how to solve this?i have shared the screenshots   
      saranya-n
  • RSS CADTutor

  • RSS CAD Forums – CAD Management

    • bak files without a dwg July 17, 2018
      Hello, I am looking for a routine or program that will search a folder/tree or drive and find bak files that do not have a dwg by the same name. Any help is appreciated. thanks, Phil
      sandiegophil
    • Import a exist page setup from a sheet set July 17, 2018
      Hi everyone. we're working with a sheet set. Sometimes we use a publish using a page setup override. We want to configurate all files and computers with a same page setup. But, when I'm doing...
      juanragal
  • RSS cadalyst

  • RSS csinet.org Fourms

    • An error has occurred; the feed is probably down. Try again later.
  • RSS Heidi Hewett blogs

    • More Ch-ch- ch-ch changes... From AutoCAD to BricsCAD
      This has been a year of change for me and it hasn’t stopped yet! Today Bricsys announced the news… I’m joining their team! In my role as User Success Manager, I’ll help BricsCAD and BIM customers maximize their investment in...
      Heidi Hewett
    • Controlling the AutoCAD Cursor Badge
      In AutoCAD 2015 badges were added to the AutoCAD cursor to help you identify the editing operation you were about to perform. For example, when you use the ERASE command and pass the cursor over an object, a small red...
      Heidi Hewett
    • Happy weekend from Above the Clouds
      Kicking off the weekend early on this cold Colorado morning with nothing related to AutoCAD.... Just one of my favorite hiking photos from "the city above the clouds". Have a great weekend!
      Heidi Hewett
    • Throwback Thursday... Replaced by AutoCAD
      Here's an oldie! This wooden pencil doesn't have a date on it but I'm guessing it's from the early nineties if not even the eighties! Who really believed back then that AutoCAD... or any CAD could replace good old paper...
      Heidi Hewett
    • Delete duplicate AutoCAD objects
      AutoCAD drawings often contain duplicate or overlapping geometry that unnecessarily bloats them and makes them more challenging to edit. There are numerous reasons overlapping geometry might be created, such as copying or drawing new geometry on top of existing geometry....
      Heidi Hewett
  • RSS Beyond The Paper

  • RSS Autodesk Fabrication

    • Submit AU 2013 Class Proposals by May 19 May 14, 2013
      Armundo Darling
    • Say hello to us at AU2012 November 21, 2012
      Sam Robins
  • RSS Reed Construction Data

    • An error has occurred; the feed is probably down. Try again later.
  • RSS Contractor Mag

    • An error has occurred; the feed is probably down. Try again later.
  • RSS Twitter Building Models

    • An error has occurred; the feed is probably down. Try again later.
  • RSS Twitter Building Law

    • An error has occurred; the feed is probably down. Try again later.
  • RSS hvacdrafting

    • Subcontractor “Pass-Through” Claims Still a Matter of Controversy
      Subcontractor “pass-through” claims, sponsored by a prime contractor against a public project owner, are both useful and controversial. A pass-through claim results from a claim liquidation agreement between the prime and the sub. The prime agrees to pursue the project owner, at the prime’s expense, for the subcontractor’s increased costs. The prime will pas […]
      Rob W
    • Autodesk Navisworks Animated Construction
      Autodesk Navisworks project review software can import project schedules from planning applications, enabling you to simulate and visually communicate construction schedules. In this video, Autodesk’s Paul Walker has further enhanced the 4D simulation by animating building components (using the Navisworks Animator feature) and rendered with Navisworks to cre […]
      Rob W
    • Learn more about the Design, Application and Installation of Custom and Standard Pipe Clamps
      Learn more about the Design, Application and Installation of Custom and Standard Pipe Clamps right from your computer for free. This technical presentation is this Thursday, July 22, 2010 at 10:00 am or 2:00 pm. Register for the Design, Application and Installation of Custom and Standard Pipe Clamps Webinar The featured presenter, Jerry Godina has […]
      Rob W
    • What is BIM Model or Building Information Modeling?
      Building Information Modeling or BIM is the latest buzzword in construction industry worldwide. It has been flaunted on the front page of construction magazines; more seminars are being arranged throughout year and many companies are involved in developing products/tools around BIM. So, what is BIM? Why it so popular and what lies there in it […]
      Rob W
    • Apps Simplify Processes Big and Small
      Whether you’re looking for a better way to log employees’ time on a project, make a crucial measurement on the jobsite, or automate business-process management, one tool required is one you most likely already have: a smartphone. Construction productivity tools are going mobile, and the combination of advancing cellphone technology and a flurry of activity [ […]
      Rob W

Autodesk Navisworks Helps You Reduce Change Orders, Costs and Waste, Earlier in the Building Process

Posted by Rob W on December 15, 2010

Win and maintain more business by preventing costly, time-consuming change orders—and demonstrating value to your clients. Learn how Autodesk® Navisworks® software can help you reliably coordinate, review, analyze, and simulate construction from detailed 3D design information in any size or format from various disciplines—quickly, easily and cost-effectively.

This self-paced, on-demand screencast demonstrates how Autodesk Navisworks helps construction professionals address challenges with miscommunication, cost over-runs, and delays by improving communication and coordination across a building project with features such as:
• Model integration from various disciplines and formats
• Project review and visualization
• Model coordination
• Clash detection
• Construction sequencing and scheduling
• And more!
Watch the screencast on your own, at your own pace, or use it to host a learning session for others on your extended project team. This screencast is a great tool for both individual learning or to watch as a group!

Register Here

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

 
%d bloggers like this: